Skip to main content
A construction is a build-up — an exterior wall, a floor deck, a roof — assembled from Library materials with a thickness or quantity for each layer. Once saved it behaves like any other Library entry: you map a model element to the whole build-up in one drop instead of layer by layer. Open New → Construction from the Library toolbar.
Constructions tab with the New menu open, offering Material and Construction.

Starting a construction

Step 1: Name it and pick a declared unit

Create construction page with the name and unit fields at the top, an empty materials area, and the searchable materials library on the right.

An empty construction

The materials area stays empty until both the name and the unit are set.

Step 2: Drag materials in

Search the Library on the right and drag a material into the drop zone. Layers are added one at a time, in any order.
Create construction page with the drop zone active and matching materials listed in the library on the right.

The drop zone

A material with no lifetime cannot be added until one is set — the app asks for it there and then, with Lifetime table for the reference values. See Missing properties.
Dialog warning that a material has no lifetime, with a field to enter one and a link to the lifetime table.

Setting a missing lifetime

Step 3: Set each layer’s dimensions

Every material you drop in opens Adjust dimensions, where you say how much of it goes into one declared unit of the construction. The 3D preview updates as you type, so a wrong order of magnitude is obvious. What it asks for depends on how the material is declared:
Adjust dimensions for a precast concrete panel, with width and thickness fields and the resulting quantity in kilograms.

A material declared by mass

Declared per kg — give width and thickness and the quantity in kilograms is derived from the material’s weight per declared unit.
Adjust dimensions for insulation, with a quantity in square metres, a lambda value, and the resulting weight.

A material declared by area

Declared per m² — give the quantity. Insulation also asks for Thickness (m) and Lambda (W/mK), which is what makes the layer’s thermal performance meaningful.
Adjust dimensions for brick, with a width field and the resulting quantity in kilograms.

A material declared by mass, sized by width

The panel always shows the conversion it is making — material unit per construction unit — plus the share of the build-up that layer represents. Close returns you to the construction.

Step 4: Check the build-up

Create construction page listing three materials with their quantities per square metre, percentage shares, and lifetimes.

Three layers added

The header reads 3 materials · per 1 m², and each layer shows its quantity per declared unit, its share of the build-up, and its lifetime. Re-open Adjust dimensions on any layer to change it, or drag another material in.
The percentages are shares of mass, not of emissions. A layer that is 0.02% of the weight can still dominate the carbon — check the construction’s own chart after saving.

Step 5: Save

Create Construction opens a preview first.
Construction preview dialog showing the name, declared value and unit, description, and the three materials with their lifetimes and shares.

Confirming before it enters the Library

Check the name, declared unit, and layers, then Save Construction — or Go back to keep editing. Once saved it appears on the Constructions tab, owned by your organization, and can be mapped, compared, and filtered like any other Library entry.

Next steps

Browse constructions

Find, inspect, edit, and clone the build-ups you have saved.

Material Mapping

Map a model element to a whole build-up in one drop.