How BR18 calculates B6
§ 297, stk. 11 sets the method:- Take the energy demand from the energy frame calculation (energirammeberegning, §§ 250–256). Use the demand without primary energy factors: both electricity and heat, in kWh per year.
- Multiply by the emission factors in BR18, bilag 2, Tabel 8.1. The factors change year by year. B6 starts in the year the building is put into use and runs for 50 years.
- Divide by the heated floor area (opvarmet etageareal, § 256, nr. 3), not by the reference area.
Tabel 8.1 emission factors
Selected years, in kg CO₂e per kWh:
The factors stay constant after 2050. The full series is in the Tabel 8.1 Excel file.
Buildings outside the energy frame
- Holiday homes (sommerhuse, campinghytter og lignende ferieboliger) can use the standard energy demand in Tabel 12.
- Extensions (tilbygninger) can use the standard energy demand in Tabel 13, or the heat-loss frame (varmetabsramme).
- Unheated buildings can set B6 to 0.
Solar cells and other on-site production
Electricity produced on the building, from solar cells or wind turbines, reduces B6 by up to 13.2 kWh/m² per year. That’s the 25 kWh/m² primary-energy cap converted to delivered energy. The electricity demand can drop below zero. Production above 13.2 kWh/m² per year is credited in module D, using the same emission factors.Enter energy use in Real-Time LCA
Open the project’s Settings and go to Energy use (B6).1
Enter heat and electricity
Choose the heat supply and the electricity supply, and enter the yearly demand from the energy frame calculation. Enter both electricity and heat. A district-heated building still has an electricity demand.
2
Enter exported electricity
Enter the electricity the building sends back to the grid under Exported electricity. Real-Time LCA credits it in module D at the electricity factor. It doesn’t subtract it from B6.Deduct the building-integrated production you’re allowed to count in B6, up to 13.2 kWh/m² per year, from the electricity demand you enter in the previous step. Enter only the surplus as exported electricity.
3
Record the validation
Under Validation, record who checked the energy figures and when. It’s required once any energy is entered.
How Real-Time LCA calculates it
- Emission factors: the BR18 (2025) series from Tabel 8.1, year by year from the commissioning year you set on the project, held constant after 2050.
- Area: B6 is divided by the heated area you enter under Building area, above and below ground. Enter heated areas that match the energy frame calculation.
Sources
- BR18 § 297, stk. 11 and 12
- BR18, bilag 2, Tabel 8.1, 12 and 13
- Vejledning om bygningers klimapåvirkning (1 July 2025)
- Artelia (2023), Emissionsfaktorer El, fjernvarme og ledningsgas 2025–2075

