# Operational energy (B6)

> How BR18 (2025) turns the energy frame into B6 emissions with the Tabel 8.1 factors, and how to enter energy use in Real-Time LCA.

Module B6 is the building's operational energy over the 50-year consideration period. Under BR18 (2025), it's calculated from the energy frame, not estimated separately.

## How BR18 calculates B6

§ 297, stk. 11 sets the method:

1. **Take the energy demand from the energy frame calculation** (*energirammeberegning*, §§ 250–256). Use the demand **without primary energy factors**: both electricity and heat, in kWh per year.
2. **Multiply by the emission factors in BR18, bilag 2, Tabel 8.1.** The factors change year by year. B6 starts in the year the building is put into use and runs for 50 years.
3. **Divide by the heated floor area** (*opvarmet etageareal*, § 256, nr. 3), not by the [reference area](https://docs.realtimelca.com/methodology-and-compliance/national-compliance/denmark/reference-area.md).

For district heating, you can use an EPD for the specific supply plant instead of the Tabel 8.1 factor. The EPD must be valid, follow ISO 14025, and cover a plant approved under the Danish Heat Supply Act (*Varmeforsyningsloven*).

### Tabel 8.1 emission factors

Selected years, in kg CO₂e per kWh:

| Year | Electricity | District heating | Mains gas |
| - | - | - | - |
| 2025 | 0.0801 | 0.0418 | 0.151 |
| 2026 | 0.0706 | 0.0371 | 0.132 |
| 2030 | 0.0325 | 0.0181 | 0.0557 |
| 2035 | 0.0291 | 0.0140 | 0.0554 |
| 2040 | 0.0285 | 0.0134 | 0.0554 |
| 2045 | 0.0261 | 0.0132 | 0.0552 |
| 2050 onwards | 0.0248 | 0.0132 | 0.0551 |

The factors stay constant after 2050. The full series is in the Tabel 8.1 Excel file.

### Buildings outside the energy frame

* **Holiday homes** (*sommerhuse, campinghytter og lignende ferieboliger*) can use the standard energy demand in **Tabel 12**.
* **Extensions** (*tilbygninger*) can use the standard energy demand in **Tabel 13**, or the heat-loss frame (*varmetabsramme*).
* **Unheated buildings** can set B6 to 0.

### Solar cells and other on-site production

Electricity produced on the building, from solar cells or wind turbines, reduces B6 by up to **13.2 kWh/m² per year**. That's the 25 kWh/m² primary-energy cap converted to delivered energy.

The electricity demand can drop below zero. Production above 13.2 kWh/m² per year is credited in module D, using the same emission factors.

## Enter energy use in Real-Time LCA

Open the project's **Settings** and go to [Energy use (B6)](https://docs.realtimelca.com/user-guide/project/project-settings.md#energy-use-b6).

**1. Enter heat and electricity**

Choose the heat supply and the electricity supply, and enter the yearly demand from the energy frame calculation. Enter both electricity and heat. A district-heated building still has an electricity demand.

**2. Enter exported electricity**

Enter the electricity the building sends back to the grid under **Exported electricity**. Real-Time LCA credits it in module D at the electricity factor. It doesn't subtract it from B6.

Deduct the building-integrated production you're allowed to count in B6, up to 13.2 kWh/m² per year, from the electricity demand you enter in the previous step. Enter only the surplus as exported electricity.

**3. Record the validation**

Under **Validation**, record who checked the energy figures and when. It's required once any energy is entered.

### How Real-Time LCA calculates it

* **Emission factors:** the BR18 (2025) series from Tabel 8.1, year by year from the **commissioning year** you set on the project, held constant after 2050.
* **Area:** B6 is divided by the **heated area** you enter under [Building area](https://docs.realtimelca.com/user-guide/project/project-settings.md#building-area), above and below ground. Enter heated areas that match the energy frame calculation.

> [!TIP]
>
> A dashboard showing 100 % embodied emissions means no B6 figures have been entered yet. See [Emission by Embodied and Operational](https://docs.realtimelca.com/user-guide/project/project-dashboard.md).

## Sources

* [BR18 § 297, stk. 11 and 12](https://www.bygningsreglementet.dk/tekniske-bestemmelser/11/krav/297_298/)
* [BR18, bilag 2, Tabel 8.1, 12 and 13](https://www.bygningsreglementet.dk/bilag/b2/bilag_2/)
* [Vejledning om bygningers klimapåvirkning (1 July 2025)](https://www.bygningsreglementet.dk/tekniske-bestemmelser/11/brv/bygningers-klimapaavirkning-1-juli-2025/)
* Artelia (2023), *Emissionsfaktorer El, fjernvarme og ledningsgas 2025–2075*