# Construction process (A4–A5)

> How BR18 (2025) calculates transport and construction-site emissions — Tabel 8, 10 and 11 — and how to set them up in Real-Time LCA.

Since 1 July 2025, BR18 has a separate limit for the construction process (*byggeprocessen*): modules **A4** (transport to site) and **A5** (construction and installation).

| Calculation type | A4 + A5 limit |
| - | - |
| BR18 (2025) | 1.5 kg CO₂e/m²/year |
| Low emission (2025) | 1.1 kg CO₂e/m²/year |

This budget is separate from the materials-and-operation limit, so savings in materials can't offset a high construction process. It's divided by the [reference area](https://docs.realtimelca.com/methodology-and-compliance/national-compliance/denmark/reference-area.md).

## What's included

The construction process covers energy, materials, and transport to and from the site for the building itself. § 297, stk. 9 narrows the scope:

* Only work related to the building's **built-up area** (*bebyggede areal*) counts. Landscaping, demolition, and site preparation outside the footprint don't.
* Machines and equipment under **1 tonne** can be left out, both for site energy and for transport.
* Transport of materials that aren't in [Tabel 6](https://docs.realtimelca.com/methodology-and-compliance/national-compliance/denmark/building-parts-and-classification.md) can be left out.
* Loss and damage during transport can be left out.
* Water use and temporary materials on site are excluded.
* For waste, only construction waste counts. For waste transport, only construction waste and soil count.

## How BR18 calculates it

The main method is **measured consumption**: fuel, electricity, and district heating, multiplied by the emission factors in BR18, bilag 2:

* **Tabel 8.1** for electricity, district heating, and mains gas, per year. For example, 0.0801 kg CO₂e/kWh for electricity in 2025.
* **Tabel 8.2** for fuels. For example, diesel is 3.44 kg CO₂e per litre.

For transport, you can calculate consumption from kilometres driven and consumption per kilometre.

**Tabel 10** offers table values as an alternative for some parts.

### Transport of materials (A4)

Instead of calculating fuel, you can use a value per kg of material built in. Tabel 10 has 35 material groups. Some examples:

| Main group | Subgroup | kg CO₂e/kg |
| - | - | - |
| Beton | Fabriksbeton | 0.0024 |
| Beton | Væg- og dækelementer | 0.011 |
| Træ | Konstruktionstræ | 0.0074 |
| Træ | Træelementer | 0.0814 |
| Stål | Armeringsstål | 0.0091 |
| Gips | Gipsplader | 0.0166 |
| Isolering | Mineraluld | 0.0196 |
| Facadeåbninger | Vinduer og døre | 0.0846 |
| Membraner og overfladebehandlinger | Dampspærre | 0.9375 |
| Tekniske bygningsinstallationer | Solceller | 0.296 |

Tabel 10 has no default transport distances. The per-kg values already cover the whole chain from factory to site, except terminal processes.

### Fixed values per square metre

These values are in kg CO₂e per m² of reference area per year:

| Module | Item | Value | When it applies |
| - | - | - | - |
| A4 | Terminal processes (*terminalprocesser*) | 0.02 | **Always**, whichever method you use |
| A4 | Surplus materials and packaging | 0.02 | When material transport uses the per-kg values |
| A4 | Transport of equipment to and from site | 0.02 | Optional, instead of calculating it |
| A5 | Removal of soil that is waste | 0.06 | Optional, instead of calculating it |
| A5 | Removal of construction waste | 0.06 | Optional, instead of calculating it |

### Construction-site energy (A5)

Energy used on site has no table value. It must come from measured consumption: meter readings for electricity and district heating, and fuel statements from contractors.

### Construction waste (A5)

Waste treatment uses **Tabel 11** (*Generiske data for behandling af byggeaffald*), in kg CO₂e per kg of waste per fraction. A mixed fraction takes the factor of the highest-impact material in it. You can use an EPD for a clean fraction instead. If you do, use the EPD's A1–A3 + C3 + C4, not its A5.

## Set it up in Real-Time LCA

**1. Turn on the standard values**

Under **Standard values**, turn on **Use standard values** to add the fixed values per m² from Tabel 10. Each one has its own switch, so you can turn off the optional values you'd rather calculate.

| Switch in Real-Time LCA | Tabel 10 item |
| - | - |
| **Terminal processes (A4)** | Terminalprocesser |
| **Transport of surplus materials (A4)** | Transport af overskudsmaterialer |
| **Transport of materials to and from the site (A4)** | Transport af materiel til og fra byggepladsen (equipment, not building materials) |
| **Removal of excavated soil as waste (A5)** | Bortkørsel af jord, som er affald |
| **Removal of construction waste (A5)** | Bortkørsel af byggeaffald |

Keep **Terminal processes (A4)** on. BR18 requires it in every project.

**2. Map transport per material**

For BR18 (2025) projects, Real-Time LCA multiplies the Tabel 10 value per kg by each material's mass. Check every material in [Transport Mapping](https://docs.realtimelca.com/user-guide/project/transport-mapping.md). A row shown in yellow has no transport yet and no A4 from its EPD.

**3. Enter site energy and waste**

Under [Installation (A5)](https://docs.realtimelca.com/user-guide/project/project-settings.md#installation-a5), enter heat supply, electricity supply, machinery fuel, and construction waste. Real-Time LCA applies the Tabel 8.1 factor for the construction year to electricity and heat.

> [!TIP]
>
> Agree with contractors and suppliers, before construction starts, which consumption data they'll deliver and when. Site energy and waste can only be documented from records kept during the build.

## Sources

* [BR18 § 297, stk. 9, and § 298, stk. 5](https://www.bygningsreglementet.dk/tekniske-bestemmelser/11/krav/297_298/)
* [BR18, bilag 2, Tabel 8.1, 8.2, 10 and 11](https://www.bygningsreglementet.dk/bilag/b2/bilag_2/)
* SBi-anvisning 283, afsnit 2.6